ChurCh refurbishment Work
The long-awaited refurbishment work in the church has ben completed:
- The 'Guild room', renamed to the 'Harris room' has external access door.
- A lift capable of lifting motorised wheel chairs has been added opposite the Harris room entrance.
- The steps from the back alley opposite the hall kitchen have been removed.
- The church hall has extra enclosed storage at the back.
- A mezzanine hall storage room above the ground floor back storage rooms has been added.
- The Link 'cross entrance' door has been replaced by an push-button automatic opening door.
- The main church:
- The main church kitchen has been replaced with an industrial kitchen.
- The worship area it has been fully opened up at the back removing the vestibule glass screen.
- The gallery has been partially levelled off and a new meeting room has been built in the gallery.
- The old kitchen has been changed in to a small office.
- An extra set of steps outside the main church entrance has been added.